Skip to main content
63°F Clear · as of · NWS KMCO
Central Florida local news, events and businesses
House promotion
HYPERLOCAL LOCAL NEWS TEASER Original Source: City of Sanford

Road Resurfacing and Reclamation Project Updates

By Orlando Connect Automated Desk (AI-assisted) • Published by City of Sanford October 20, 2026 • added here October 20, 2026
Road Resurfacing and Reclamation Project Updates
📷 Photo: City of Sanford

The City of Sanford has hired Asphalt Paving Systems, Inc. to perform roadway reclamation and paving on designated neighborhood streets during the weeks of October 12 and October 26. Work will include milling, reshaping and a new lift of asphalt, with elevation drops of up to 2 inches. Residents should expect minor delays and limited access while crews and traffic control personnel manage the site; full access will be restored during non‑working hours. A period of up to 7 days may occur between the roadway treatment and the final asphalt overlay.

Vehicle owners are required to clear the roadway during the work. A no‑parking window from 7:00 AM to 7:00 PM will be in effect on the scheduled day of application, and no vehicles, boats, trailers or debris may be left in the right‑of‑way. Any vehicle remaining in the work zone will be towed at the owner’s expense.


Press release issued by City of Sanford:
https://sanfordfl.gov/road-resurfacing-and-reclamation-project-updates/

🤖 AI-assisted content notice: This item was written with AI assistance from the source document linked above. The underlying facts come from that public source, not from our own reporting. No quotes, interviews or original reporting are implied. Spotted something wrong? Email corrections@theorlandoconnect.com.

This short news teaser was curated from City of Sanford.
Read Full Story on City of Sanford ↗
House promotion

More from your communities

All latest →